On-site service · New Westminster, BC

Parking-lot painting in New Westminster

City Wide paints parking-lot and parkade markings for New Westminster strata, commercial and industrial properties. Bring the existing parking plan, the required changes and the available closure windows.

Family-owned. Serving the Lower Mainland since 1989.

Line-painting machine applying a yellow marking on pavement
Photo from City Wide’s service gallery.

A coordinated parking-area repaint brings stall lines, arrows and related markings into one work plan. Use the line-painting service for warehouse routes and smaller marking lists.

Scope and preparation

Review the parking layout before repainting

List stall lines, numbers, directional arrows, pedestrian markings, curbs and related wall painting. Identify the markings to retain, remove or relocate.

Supply the approved dimensions, colours and symbols. A revised stall arrangement, accessible route or traffic pattern may require design or property approval before painting. Line painting is available for a smaller marking list or warehouse floor.

Plan the work

Sequence the repaint around the site

Describe loose or failing paint, oil residue, coatings and damaged pavement. Cleaning, old-mark removal or asphalt repairs may need to precede the repaint.

Plan vehicle relocation, delivery access and the order of sections. Outdoor work also depends on suitable application conditions. Confirm the paint system and reopening instructions before issuing tenant notices.

Details for your quote

  • Send the existing plan and identify all layout changes.
  • List stalls, numbers, arrows, symbols, curbs and wall areas.
  • Photograph failing paint, residue and damaged surfaces.
  • Give closure windows, vehicle-relocation plans and layout approval details.

Before you enquire

Questions about the service

Can the parking lot be painted in phases?

Show the entrances and routes that must stay open. The preparation, marking sequence and application conditions determine whether phased work is suitable.

Can a faded layout be changed during the repaint?

Provide the approved revised plan before work starts. Old markings may need removal or treatment so the new layout is unambiguous.

Is wall painting included?

List the walls, finish, approximate areas and preparation needed. Confirm it as a separate item alongside the floor or parking markings.

Request a quote