On-site service · Richmond, BC
Parkade cleaning for Richmond strata and commercial sites
Ask City Wide about parkade cleaning at your Richmond property. Describe the parking levels, floor condition, vehicle access and the areas you can make available for cleaning.
Family-owned. Serving the Lower Mainland since 1989.

A parkade cleaning plan needs clear floor areas and a practical route through the building. Drainage chambers, markings, surface repairs and other work should be identified separately.
Scope and preparation
Describe each level and the cleaning required
Give the number of levels and approximate floor areas. Provide photographs of soil, deposits and affected corners, ramps or driving lanes. Note the existing floor finish, sensitive surfaces and earlier cleaning or coating work.
Include catch-basin cleaning, connected pipe work and material removal when needed, with their locations marked. Explain any interest in repainting parking markings after cleaning so preparation and sequence can be reviewed.
Plan the work
Coordinate parked vehicles, equipment and work phases
Provide vehicle clearances, gate access and the equipment route. Explain how stalls will be cleared and how residents, staff or customers will receive access information. Identify entrances and vehicle routes that need to stay available.
Discuss phased closures and the proposed cleaning and water-management arrangements. The quote should state the included floor areas and related tasks, with reopening and communication responsibilities agreed for the building.
Details for your quote
- Give floor areas, levels, ramps and current surface conditions.
- Mark drainage points and related work requested.
- Confirm vehicle clearances and equipment access.
- Explain stall clearing, phased closures and site communication.
Before you enquire
Questions about the service
Does parkade floor cleaning include catch basins?
Include the basins explicitly if they need cleaning. Floor cleaning, chamber cleaning and pipe work have different scopes, and the quote should identify the tasks included.
Can cleaning be planned in separate areas?
Send the areas that can close together and the routes that must remain available. Phasing needs review against equipment access, the cleaning method and the building’s use.
Should new markings be arranged before cleaning?
Share the proposed marking work early so the sequence can be discussed. Cleaning, any repairs and surface preparation may need to happen before paint is applied.
